Addenbrooke Classical Academy
|
- Addition of a new athletic field with two new entrances.
- New roof with new heating & air conditioning units & solar panels.
- Construction of a fence around the new field.
|
Collegiate Academy
|
- Renovate classrooms.
- Addition to the property & learning spaces
- Additional property acquisition
- Building improvements including roof, heating & air conditioning, fire safety & energy efficiency.
- Retire a portion of current building bonds.
|
Compass Montessori Golden
|
- Repair & replace facility structural & mechanical systems at end of useful life/failing.
- Provide new additions & remodeling to existing structure to alleviate classroom overcrowding,
- enhance campus safety & provide improved space for educational programming.
- Modify & expand facility space to address overcrowding with focus on high school & middle school.
|
Compass Montessori Wheat Ridge
|
- Repair & replace facility structural & mechanical systems at end of useful life/failing.
- Provide new additions & remodeling to the existing structure to alleviate classroom overcrowding.
- Replace roof, new windows & upgrade heating & air conditioning system.
|
Doral Academy
|
- Upgrade flooring, building security cameras & partial security fencing.
- Upgrade classroom media & arts.
- Playground improvements for arts integration.
- Upgrade kitchen & obtain “prep kitchen” licensure.
- Upgrades to multi-purpose gym audio & visual & bleacher seating.
|
Excel Academy |
- Relocate parking lot to allow for 16,500 building addition, including 11 classrooms & multi-purpose &
- common areas.
- Add exterior lighting & cameras.
- Install building-wide cell signal amplifier & PA system to non-covered areas.
- Replace countertops & cabinets in the art room & teachers’ lounge.
- Upgrade security system panel, convert to key-less entry/access on exterior doors.
- Install bell system for middle school.
- Replace flooring in the cafeteria, art room, science lab & front entry.
- Resurface & upgrade playground.
- Replace the existing roof.
|
Great Work Montessori |
- Add operable partitions in classrooms 205, 208 & 211.
- Convert classroom 202 into a science classroom.
- Administration & classroom technology refresh.
|
Jefferson Academy Elementary |
- Playground renovations including Outdoor Learning Pavilion and other shade structures.
- Redesigned play spaces including moving and adding play structures.
- ADA accessibility, ground stormwater mitigation and emergency vehicle access.
- Repair and/or replacement of needed facility infrastructure.
|
Jefferson Academy Secondary |
- Addition of four classrooms (visual arts, instrumental music & A/V studio stagecraft).
- ~300 seat auditorium/performance center, MakerSpace, Display Gallery/Foyer.
- Weight room addition, gym expansion and/or auxiliary gym, expanded parking lot.
|
Lincoln Academy |
- Upgrade campus security to improve lighting, cameras, fencing & traffic barriers.
- Update old electrical wiring, panels & increase capacity.
- Update old heating & cooling equipment, plumbing fixtures & piping.
- Asphalt and sidewalk improvements with additional parking spaces west of the south lot.
- Upgrade fire alarm.
|
Montessori Peaks Academy |
- Reduce current bond debt.
- Phase III construction on existing land: 13,000 sq. ft. addition to the existing building.
- Miscellaneous repairs & improvements to existing structures & grounds, including playground
- expansion/addition, replace heating & air conditioning system, replace carpets, replace phone system, new windows, replace marquee, add solar tube lighting, add solar panels, repair/new asphalt in the parking lot.
|
Mountain Phoenix Community School |
- Complete third phase of middle school project, theatre/multi-use building.
- Add cafeteria & update kitchen.
- Replace play structure, resurface & install proper drainage on playing field.
- Security upgrades, replace/repair heating & air conditioning system & replace old windows.
- Replace ECE play structure.
|
The New American School |
- Immediate purchase of current school building at a cost of approximately $2,840,000.
- Immediate purchase of attached outdoor parking space at a cost of approximately $660,000.
|
Rocky Mountain Academy of Evergreen |
- Improve Campus Security/Safety: Upgrade/install security systems; Upgrade phone system; Upgrade emergency lighting; Upgrade entryways; Make parking lot improvement.
- Exterior Updates/Repairs: Replace playground; Replace/improve grading; Repair/replace roofing
- Interior Upgrades/Repairs: Upgrade bathrooms; Replace furniture; Update lighting; Replace carpeting; Painting.
- Reduce/Restructure debt service pursuant to Board of Directors Strategic Plan.
|
Rocky Mountain Deaf School |
- Security upgrades including system & cameras.
- Key-less entries/card swipe.
- Vent for science safety requirement.
- Appropriate shade/cover structure for the playground.
- Outdoor learning space/amphitheater.
- Bus shelter.
|
Two Roads Charter School |
- Major renovations to Building A.
- New windows, updated electrical & other improvements to oldest buildings.
- Construct additional building to include a functioning kitchen, cafeteria & library.
- Update technology, safety & security measures, phone system, furniture & repave parking lot.
|
Woodrow Wilson Academy |
- Create a capital master plan to address building & landscaping needs.
- Improve existing parking lot including re-grading, paving & striping.
- Reduce or eliminate existing bond debt.
|