JEFFCO BUILDS ARTICULATION AREAS - CHARTER SCHOOLS

Thank you Jeffco Voters for making the choice to support our schools.

Jeffco Public Schools is divided into 17 areas providing assigned schools for each neighborhood served as well as option and charter school choices

JEFFCO BUILDS ARTICULATION AREAS - CHARTER SCHOOLS

School IMPROVEMENTS
Addenbrooke Classical Academy 

  • Addition of a new athletic field with two new entrances
  • New roof with new heating & air conditioning units & solar panels
  • Construction of a fence around the new field
back to artic areas
Collegiate Academy


  •  Renovate classrooms
  • Addition to the property & learning spaces
  • Additional property acquisition
  • Building improvements including roof, heating & air conditioning, fire safety & energy efficiency
  • Retire a portion of current building bonds
back to artic areas
Compass Montessori Golden 

  •  Repair & replace facility structural & mechanical systems at end of useful life/failing
  • Provide new additions & remodeling to existing structure to alleviate classroom overcrowding
  • enhance campus safety & provide improved space for educational programming
  • Modify & expand facility space to address overcrowding with focus on high school & middle school
back to artic areas
Compass Montessori Wheat Ridge 

  • Repair & replace facility structural & mechanical systems at end of useful life/failing
  • Provide new additions & remodeling to the existing structure to alleviate classroom overcrowding
  • Replace roof, new windows & upgrade heating & air conditioning system
back to artic areas
Doral Academy 

  •  Upgrade flooring, building security cameras & partial security fencing
  • Upgrade classroom media & arts
  • Playground improvements for arts integration
  • Upgrade kitchen & obtain “prep kitchen” licensure
  • Upgrades to multi-purpose gym audio & visual & bleacher seating
back to artic areas
Excel Academy 
  • Relocate parking lot to allow for 16,500 building addition, including 11 classrooms & multi-purpose &common areas
  • Add exterior lighting & cameras.
  • Install building-wide cell signal amplifier & PA system to non-covered areas.
  • Replace countertops & cabinets in the art room & teachers’ lounge.
  • Upgrade security system panel, convert to key-less entry/access on exterior doors.
  • Install bell system for middle school.
  • Replace flooring in the cafeteria, art room, science lab & front entry.
  • Resurface & upgrade playground
  • Replace the existing roof
back to artic areas
Great Work Montessori
  • Add operable partitions in classrooms 205, 208 & 211
  • Convert classroom 202 into a science classroom
  • Administration & classroom technology refresh
back to artic areas
Jefferson Academy Elementary
  • Playground renovations including Outdoor Learning Pavilion and other shade structures
  • Redesigned play spaces including moving and adding play structures
  • ADA accessibility, ground stormwater mitigation and emergency vehicle access
  • Repair and/or replacement of needed facility infrastructure
back to artic areas
Jefferson Academy Secondary
  • Addition of four classrooms (visual arts, instrumental music & A/V studio stagecraft)
  • ~300 seat auditorium/performance center, MakerSpace, Display Gallery/Foyer
  • Weight room addition, gym expansion and/or auxiliary gym, expanded parking lot
back to artic areas
Lincoln Academy
  • Upgrade campus security to improve lighting, cameras, fencing & traffic barriers
  • Update old electrical wiring, panels & increase capacity
  • Update old heating & cooling equipment, plumbing fixtures & piping
  • Asphalt and sidewalk improvements with additional parking spaces west of the south lot
  • Upgrade fire alarm
back to artic areas
Montessori Peaks Academy
  • Reduce current bond debt
  • Phase III construction on existing land: 13,000 sq. ft. addition to the existing building
  • Miscellaneous repairs & improvements to existing structures & grounds, including playground
  • Expansion/addition, replace heating & air conditioning system, replace carpets, replace phone system, new windows, replace marquee, add solar tube lighting, add solar panels, repair/new asphalt in the parking lot
back to artic areas
Mountain Phoenix Community School 
  • Complete third phase of middle school project, theatre/multi-use building
  • Add cafeteria & update kitchen
  • Replace play structure, resurface & install proper drainage on playing field.
  • Security upgrades, replace/repair heating & air conditioning system & replace old windows
  • Replace ECE play structure
back to artic areas
The New American School
  •  Immediate purchase of current school building at a cost of approximately $2,840,000
  • Immediate purchase of attached outdoor parking space at a cost of approximately $660,000
back to artic areas
Rocky Mountain Academy of Evergreen 
  • Improve Campus Security/Safety: Upgrade/install security systems; Upgrade phone system; Upgrade emergency lighting; Upgrade entryways; Make parking lot improvement
  • Exterior Updates/Repairs: Replace playground; Replace/improve grading; Repair/replace roofing
  • Interior Upgrades/Repairs: Upgrade bathrooms; Replace furniture; Update lighting; Replace carpeting; Painting
  • Reduce/Restructure debt service pursuant to Board of Directors Strategic Plan
back to artic areas
Rocky Mountain Deaf School 
  • Security upgrades including system & cameras
  • Key-less entries/card swipe
  • Vent for science safety requirement
  • Appropriate shade/cover structure for the playground
  • Outdoor learning space/amphitheater
  • Bus shelter
back to artic areas
Two Roads Charter School
  • Major renovations to Building A
  • New windows, updated electrical & other improvements to oldest buildings
  • Construct additional building to include a functioning kitchen, cafeteria & library
  • Update technology, safety & security measures, phone system, furniture & repave parking lot
back to artic areas
Woodrow Wilson Academy
  • Create a capital master plan to address building & landscaping needs
  • Improve existing parking lot including re-grading, paving & striping
  • Reduce or eliminate existing bond debt
back to artic areas
Estimated cost of proposed improvements subject to change per final project scope. Estimated project time line subject to change.