Addenbrooke Classical Academy
|
- Addition of a new athletic field with two new entrances
- New roof with new heating & air conditioning units & solar panels
- Construction of a fence around the new field
back to artic areas
|
Collegiate Academy
|
- Renovate classrooms
- Addition to the property & learning spaces
- Additional property acquisition
- Building improvements including roof, heating & air conditioning, fire safety & energy efficiency
- Retire a portion of current building bonds
back to artic areas
|
Compass Montessori Golden
|
- Repair & replace facility structural & mechanical systems at end of useful life/failing
- Provide new additions & remodeling to existing structure to alleviate classroom overcrowding
- enhance campus safety & provide improved space for educational programming
- Modify & expand facility space to address overcrowding with focus on high school & middle school
back to artic areas
|
Compass Montessori Wheat Ridge
|
- Repair & replace facility structural & mechanical systems at end of useful life/failing
- Provide new additions & remodeling to the existing structure to alleviate classroom overcrowding
- Replace roof, new windows & upgrade heating & air conditioning system
back to artic areas
|
Doral Academy
|
- Upgrade flooring, building security cameras & partial security fencing
- Upgrade classroom media & arts
- Playground improvements for arts integration
- Upgrade kitchen & obtain “prep kitchen” licensure
- Upgrades to multi-purpose gym audio & visual & bleacher seating
back to artic areas
|
Excel Academy |
- Relocate parking lot to allow for 16,500 building addition, including 11 classrooms & multi-purpose &common areas
- Add exterior lighting & cameras.
- Install building-wide cell signal amplifier & PA system to non-covered areas.
- Replace countertops & cabinets in the art room & teachers’ lounge.
- Upgrade security system panel, convert to key-less entry/access on exterior doors.
- Install bell system for middle school.
- Replace flooring in the cafeteria, art room, science lab & front entry.
- Resurface & upgrade playground
- Replace the existing roof
back to artic areas
|
Great Work Montessori |
- Add operable partitions in classrooms 205, 208 & 211
- Convert classroom 202 into a science classroom
- Administration & classroom technology refresh
back to artic areas
|
Jefferson Academy Elementary |
- Playground renovations including Outdoor Learning Pavilion and other shade structures
- Redesigned play spaces including moving and adding play structures
- ADA accessibility, ground stormwater mitigation and emergency vehicle access
- Repair and/or replacement of needed facility infrastructure
back to artic areas
|
Jefferson Academy Secondary |
- Addition of four classrooms (visual arts, instrumental music & A/V studio stagecraft)
- ~300 seat auditorium/performance center, MakerSpace, Display Gallery/Foyer
- Weight room addition, gym expansion and/or auxiliary gym, expanded parking lot
back to artic areas
|
Lincoln Academy |
- Upgrade campus security to improve lighting, cameras, fencing & traffic barriers
- Update old electrical wiring, panels & increase capacity
- Update old heating & cooling equipment, plumbing fixtures & piping
- Asphalt and sidewalk improvements with additional parking spaces west of the south lot
- Upgrade fire alarm
back to artic areas
|
Montessori Peaks Academy |
- Reduce current bond debt
- Phase III construction on existing land: 13,000 sq. ft. addition to the existing building
- Miscellaneous repairs & improvements to existing structures & grounds, including playground
- Expansion/addition, replace heating & air conditioning system, replace carpets, replace phone system, new windows, replace marquee, add solar tube lighting, add solar panels, repair/new asphalt in the parking lot
back to artic areas
|
Mountain Phoenix Community School |
- Complete third phase of middle school project, theatre/multi-use building
- Add cafeteria & update kitchen
- Replace play structure, resurface & install proper drainage on playing field.
- Security upgrades, replace/repair heating & air conditioning system & replace old windows
- Replace ECE play structure
back to artic areas
|
The New American School |
- Immediate purchase of current school building at a cost of approximately $2,840,000
- Immediate purchase of attached outdoor parking space at a cost of approximately $660,000
back to artic areas
|
Rocky Mountain Academy of Evergreen |
- Improve Campus Security/Safety: Upgrade/install security systems; Upgrade phone system; Upgrade emergency lighting; Upgrade entryways; Make parking lot improvement
- Exterior Updates/Repairs: Replace playground; Replace/improve grading; Repair/replace roofing
- Interior Upgrades/Repairs: Upgrade bathrooms; Replace furniture; Update lighting; Replace carpeting; Painting
- Reduce/Restructure debt service pursuant to Board of Directors Strategic Plan
back to artic areas
|
Rocky Mountain Deaf School |
- Security upgrades including system & cameras
- Key-less entries/card swipe
- Vent for science safety requirement
- Appropriate shade/cover structure for the playground
- Outdoor learning space/amphitheater
- Bus shelter
back to artic areas
|
Two Roads Charter School |
- Major renovations to Building A
- New windows, updated electrical & other improvements to oldest buildings
- Construct additional building to include a functioning kitchen, cafeteria & library
- Update technology, safety & security measures, phone system, furniture & repave parking lot
back to artic areas
|
Woodrow Wilson Academy |
- Create a capital master plan to address building & landscaping needs
- Improve existing parking lot including re-grading, paving & striping
- Reduce or eliminate existing bond debt
back to artic areas
|